The following documents are available for download. Documents in PDF format can be read using Adobe Reader.
More downloads in Planning
Available downloads
1App form
An overview of 1APP, the new standardised planning application form
- 1App form
(PDF) - Size: 481.2 KB
- Estimated download time: (56k = 1 mins 11 secs)
Annual Monitoring Report 2007/2008
- Annual Monitoring Report 2007/2008
(PDF) - Size: 860.04 KB
- Estimated download time: (56k = 2 mins 6 secs)
Annual Monitoring Report 2008/2009
- Annual Monitoring Report 2008/2009
(PDF) - Size: 1.76 MB
- Estimated download time: (56k = 4 mins 24 secs)
Article 4 - Pear Tree Farm - April 2009
- Article 4 - Pear Tree Farm - April 2009
(PDF) - Size: 96 KB
- Estimated download time: (56k = 15 secs)
Article 4 - Willoughby - Feb 2009
- Article 4 - Willoughby Road
(PDF) - Size: 106.48 KB
- Estimated download time: (56k = 16 secs)
Changes to the Development Control System
Design & Access Statements - The requirements
- Changes to the Development Control System
(PDF) - Size: 632.5 KB
- Estimated download time: (56k = 1 mins 33 secs)
Choice of Enforcement Approach
In any situation which requires action to ensure compliance with the law, officers will consider the following when deciding on the most appropriate enforcement method
- Choice of Enforcement Approach
(DOC) - Size: 34.5 KB
- Estimated download time: (56k = 6 secs)
Core Strategy Background Paper No.1
This is a preparation document for the Core Strategy.
- Core Strategy Background Paper No.1
(PDF) - Size: 582.08 KB
- Estimated download time: (56k = 1 mins 26 secs)
Core Strategy Examination
Last updated March 2010
- Preliminary Questions by the Inspector and the Council’s replies
(PDF) - Size: 85.75 KB
- Estimated download time: (56k = 13 secs)
- Rugby Borough Council Core Strategy Exploratory Meeting - Introduction Letter
(PDF) - Size: 30.82 KB
- Estimated download time: (56k = 5 secs)
- Core Strategy Exploratory Meeting - Summary of Inspector's concerns
(PDF) - Size: 63.47 KB
- Estimated download time: (56k = 10 secs)
- Core Strategy Examination - Exploratory Meeting Agenda
(PDF) - Size: 53.17 KB
- Estimated download time: (56k = 8 secs)
- Core Strategy Examination - Exploratory Meeting decision letter 31 March 2010
(PDF) - Size: 188.37 KB
- Estimated download time: (56k = 28 secs)
- Close of Post Submission Consultation - RBC letter
(PDF) - Size: 29.18 KB
- Estimated download time: (56k = 5 secs)
- RSS Implication and Evidence Base - RBC response
(PDF) - Size: 17.32 KB
- Estimated download time: (56k = 3 secs)
- RSS Implications and Evidence Base - Letter from Inspector
(PDF) - Size: 102.3 KB
- Estimated download time: (56k = 15 secs)
Core Strategy: Draft Preferred Options Paper
The content of the Preferred Options Paper has been approved by the Council for the purposes of public consultation. The formal consultation period runs from 22nd September to 31st October 2008.
- Core Strategy: Draft Preferred Options Paper
(PDF) - Size: 5.08 MB
- Estimated download time: (56k = 12 mins 41 secs)
- Preferred Options - 1 Introduction
(PDF) - Size: 898.36 KB
- Estimated download time: (56k = 2 mins 12 secs)
- Preferred Options - 2 What's Rugby Like?
(PDF) - Size: 471.87 KB
- Estimated download time: (56k = 1 mins 11 secs)
- Preferred Options - 3 Future Development
(PDF) - Size: 71.34 KB
- Estimated download time: (56k = 11 secs)
- Preferred Options - 4 What do we want Rugby to be like?
(PDF) - Size: 450.01 KB
- Estimated download time: (56k = 1 mins 6 secs)
- Preferred Options - 5 Development Strategy
(PDF) - Size: 339.49 KB
- Estimated download time: (56k = 50 secs)
- Preferred Options - 6 Rural Area
(PDF) - Size: 551.13 KB
- Estimated download time: (56k = 1 mins 21 secs)
- Preferred Options - 7 Urban Area
(PDF) - Size: 2.68 MB
- Estimated download time: (56k = 6 mins 42 secs)
- Preferred Options - 8 Rugby Town Centre
(PDF) - Size: 4.69 MB
- Estimated download time: (56k = 11 mins 44 secs)
- Preferred Options - 9 Climate Change and Sustainable Design
(PDF) - Size: 346.64 KB
- Estimated download time: (56k = 51 secs)
- Preferred Options - 10 Economic Development
(PDF) - Size: 837.13 KB
- Estimated download time: (56k = 2 mins 3 secs)
- Preferred Options - 11 Gypsy and Traveller Accomodation
(PDF) - Size: 662.52 KB
- Estimated download time: (56k = 1 mins 38 secs)
- Preferred Options - 12 Open Space
(PDF) - Size: 2 MB
- Estimated download time: (56k = 5 mins 0 secs)
- Preferred Options - 13 What Next?
(PDF) - Size: 76.46 KB
- Estimated download time: (56k = 12 secs)
- Preferred Options Paper - Response Form
(PDF) - Size: 122.93 KB
- Estimated download time: (56k = 18 secs)
Core Strategy: Options Discussion Paper
The Core Strategy: Options Discussion Paper available for public consultation from 21st January to 3rd March
- 1 Thanks for Reading
(PDF) - Size: 36.05 KB
- Estimated download time: (56k = 6 secs)
- 2 What is Rugby Like
(PDF) - Size: 1.08 MB
- Estimated download time: (56k = 2 mins 44 secs)
- 3 Future Development
(PDF) - Size: 957 KB
- Estimated download time: (56k = 2 mins 20 secs)
- 4 The Key Issues
(PDF) - Size: 38.83 KB
- Estimated download time: (56k = 6 secs)
- 5 What do we want
(PDF) - Size: 40.01 KB
- Estimated download time: (56k = 6 secs)
- 6 Spatial Objectives
(PDF) - Size: 34.16 KB
- Estimated download time: (56k = 5 secs)
- 7 Spatial Options
(PDF) - Size: 3.11 MB
- Estimated download time: (56k = 7 mins 47 secs)
- 8 Development Strategy Options
(PDF) - Size: 430.32 KB
- Estimated download time: (56k = 1 mins 3 secs)
- 9 Urban Extension Options
(PDF) - Size: 1.44 MB
- Estimated download time: (56k = 3 mins 36 secs)
- 10 Town Centre Options
(PDF) - Size: 390.35 KB
- Estimated download time: (56k = 58 secs)
- 11 Policy Options
(PDF) - Size: 42.89 KB
- Estimated download time: (56k = 7 secs)
- 12 What Next
(PDF) - Size: 32.87 KB
- Estimated download time: (56k = 5 secs)
- Preliminary Sustainability Appraisal
(PDF) - Size: 1.3 MB
- Estimated download time: (56k = 3 mins 15 secs)
- Response Form PDF
(PDF) - Size: 81.62 KB
- Estimated download time: (56k = 12 secs)
- Response Form
(DOC) - Size: 85 KB
- Estimated download time: (56k = 13 secs)
- Options Discussion Paper
(PDF) - Size: 7.19 MB
- Estimated download time: (56k = 17 mins 59 secs)
Core Strategy: Sustainability Appraisal
These documents are the Core Strategy Sustainability Appraisal which collectively set out elements of how the Core Strategy DPD has been formulated.
- Sustainability Appraisal - July 2009
(PDF) - Size: 2.6 MB
- Estimated download time: (56k = 6 mins 30 secs)
- Sustainability Appraisal - Appendices - July 2009
(PDF) - Size: 3.57 MB
- Estimated download time: (56k = 8 mins 56 secs)
Electronic application submission template
This template is for agents/applicants to submit with all electronic planning applications not submitted via the Planning Portal.
- Electronic application submission template
(DOC) - Size: 24 KB
- Estimated download time: (56k = 4 secs)
Enforcement Register
Rugby Borough Council Register of Enforcement Notices and Stop Notices.
- Enforcement Register - August 2010
(PDF) - Size: 107.63 KB
- Estimated download time: (56k = 16 secs)
Notice 1
Notice to be served on the owner of a site.
- Notice 1
(PDF) - Size: 26.67 KB
- Estimated download time: (56k = 4 secs)
Notice to serve on Owners of a site - Householder Development
Last updated April 2009
- Notice to serve on Owners of a site - Householder Development
(PDF) - Size: 72.18 KB
- Estimated download time: (56k = 11 secs)
Planning - Amenity standards for planning applications
Amenity standards for planning applications
- Planning - Amenity standards for planning applications
(DOC) - Size: 55.5 KB
- Estimated download time: (56k = 9 secs)
Planning Decisions
A register of decisions made on Planning Applications
- Planning Decisions - 19-09-05
(PDF) - Size: 7.71 KB
- Estimated download time: (56k = 2 secs)
- Planning Decisions 26-09-05
(PDF) - Size: 8.09 KB
- Estimated download time: (56k = 2 secs)
- Planning Decisions - 03-10-05
(PDF) - Size: 26.77 KB
- Estimated download time: (56k = 4 secs)
- Planning Decisions - 10-10-05
(PDF) - Size: 12.78 KB
- Estimated download time: (56k = 2 secs)
- Planning Decisions - 17-10-05
(PDF) - Size: 31.48 KB
- Estimated download time: (56k = 5 secs)
- Planning Decisions - 21-10-05
(PDF) - Size: 21.85 KB
- Estimated download time: (56k = 4 secs)
- Planning Decisions - 28-10-05
(RTF) - Size: 51.15 KB
- Estimated download time: (56k = 8 secs)
- Planning Decisions - 4-11-05
(DOC) - Size: 57.5 KB
- Estimated download time: (56k = 9 secs)
- Planning Decisions -11-11-05
(RTF) - Size: 133.96 KB
- Estimated download time: (56k = 20 secs)
- Planning Decisions 02-12-2005
(PDF) - Size: 194.2 KB
- Estimated download time: (56k = 29 secs)
Planning Enforcement Policy Statement
Last Reviewed Feb 2009 - This Enforcement Policy Statement sets out how planning enforcement operates, the powers available and the priorities that will be adopted dealing with complaints and breaches
- Planning Enforcement Policy Statement
(PDF) - Size: 137.78 KB
- Estimated download time: (56k = 21 secs)
Planning Fee Schedule
Valid from 26 February 2010
- Planning Fee Schedule - from 26 February 2010
(PDF) - Size: 49.61 KB
- Estimated download time: (56k = 8 secs)
- Planning photocopy charges - from Aug 2009
(PDF) - Size: 12.94 KB
- Estimated download time: (56k = 2 secs)
Planning Services - Annual Monitoring Report
The statutory Annual Monitoring Report of Rugby Borough Council, Planning Services. The current report relates to the monitoring year from 1st April 2006 to 31st March 2007. Archived reports are also available.
- Planning Services - Annual Monitoring Report
(PDF) - Size: 1.56 MB
- Estimated download time: (56k = 3 mins 53 secs)
- Planning Services - Annual Monitoring Report 05-06
(PDF) - Size: 3.03 MB
- Estimated download time: (56k = 7 mins 35 secs)
- Planning Services - Annual Monitoring Report 04-05
(PDF) - Size: 1.63 MB
- Estimated download time: (56k = 4 mins 5 secs)
- Planning Services - Monitoring Report 03-04
(PDF) - Size: 121.99 KB
- Estimated download time: (56k = 18 secs)
Public consultation statement
Public consultation Statement for draft Planning Obligations SPD
- Public consultation statement
(DOC) - Size: 31 KB
- Estimated download time: (56k = 5 secs)
- Public consultation statement
(PDF) - Size: 27.67 KB
- Estimated download time: (56k = 5 secs)
Rugby Borough Council Planning Services: Planning the future together - Questionnaire
Rugby Borough Council Planning Services: Planning the future together - Questionnaire
- Rugby Borough Council Planning Services: Planning the future together - Questionnaire
(DOC) - Size: 30 KB
- Estimated download time: (56k = 5 secs)
- Rugby Borough Council Planning Services: Planning the future together - Questionnaire
(PDF) - Size: 12.21 KB
- Estimated download time: (56k = 2 secs)
Search instructions for RBC Appeals
Planning Appeal Search instructions for the Planning Casework Service.
- Search instructions for RBC Appeals
(PDF) - Size: 118.27 KB
- Estimated download time: (56k = 18 secs)
Strategic Housing Market Assessment March 2008
West Midlands C2 Housing Market Area Strategic Housing Market Assessment (March 2008)
- Strategic Housing Market Assessment
(PDF) - Size: 2.37 MB
- Estimated download time: (56k = 5 mins 56 secs)
Sustainability Appraisal
Sustainability Appraisal of draft Planning Obligations SPD
- Sustainability Appraisal
(DOC) - Size: 8.94 MB
- Estimated download time: (56k = 22 mins 20 secs)
- Sustainability Appraisal
(PDF) - Size: 181.78 KB
- Estimated download time: (56k = 27 secs)
Sustainability Appraisal Scoping Report Consultation Questions
Consultation Questions for the Local Development Framework Sustainability Appraisal Scoping Report
- Sustainability Appraisal Scoping Report Consultation Questions
(PDF) - Size: 71.33 KB
- Estimated download time: (56k = 11 secs)
- Sustainability Appraisal Scoping Report Consultation Questions
(DOC) - Size: 62 KB
- Estimated download time: (56k = 10 secs)